Our City Online

office

What’s Next for Downtown?

Brent Warren Brent Warren What’s Next for Downtown?

By some measures, 2020 was a typical year for Downtown; it once again topped CU’s annual list of neighborhoods with the most announced and completed development projects, and new apartment buildings continued to open throughout the year. Several new, high-profile proposals were also unveiled – including one for a 30-story mixed-use tower on a North High Street […]

No Comments

Plans Presented for Confluence Village Development

Brent Warren Brent Warren Plans Presented for Confluence Village Development

The latest plans for Confluence Village were presented virtually to the Downtown Commission this morning. The first phase of the development, which will sit between the currently under-construction Crew Stadium and the Olentangy River, will contain a five-story office building and 440 residential units spread over two buildings. Dan Gore, Senior Vice President of the […]

No Comments

Plan Calls for Phased Redevelopment of Worthington Mall

Brent Warren Brent Warren Plan Calls for Phased Redevelopment of Worthington Mall

A proposal to redevelop the Shops at Worthington Place was presented to Worthington’s planning commission and architecture review board last week. The plan, which calls for building as much as 250,000 square feet of office space on the site, will likely be heard several times by those boards before eventually moving on to city council. […]

No Comments

Lightning Strikes Bellows School in Franklinton

Brent Warren Brent Warren Lightning Strikes Bellows School in Franklinton

The former Bellows School in Franklinton was struck by lightning last night, but the owner of the building insists that the damage was minimal and that renovation plans are still on track. Yhezkel Levi, who bought the historic building in 2014 and announced plans to convert it into condos in 2017, told CU that Columbus […]

No Comments

New Hotel Could be First Step in Densification of Easton

Brent Warren Brent Warren New Hotel Could be First Step in Densification of Easton

After two decades of growing out, Easton could soon be growing up in a significant way for the first time. A request to allow buildings as tall as 200 feet to be built at the southwest corner of Stelzer Road and Alston Street – just south of the 16-acre Easton expansion that saw its first […]

No Comments

Modern Building Going Up on Main Street in Bexley

Brent Warren Brent Warren Modern Building Going Up on Main Street in Bexley

Work is well underway on a three-story building at the northwest corner of Main Street and Parkview Avenue in Bexley. Ohio State Bank will occupy the first floor of the building, which is on track to be completed by next summer. The prominent site – just under an acre in size, and bordering Alum Creek […]

No Comments

Work Begins on Second Phase of Pizzuti’s “The Sutton”

Walker Evans Walker Evans Work Begins on Second Phase of Pizzuti’s “The Sutton”

The second of two new buildings at the Short North intersection of First Avenue and High Street is well under way. Known as “The Residences at The Sutton,” this six-story building will be the residential complement to the four-story “The Offices at The Sutton” building on the corner. “The Residences at The Sutton is uniquely […]

No Comments

1 2 3 11

metro categories

Subscribe below: