Our City Online

Kim Ulle

New Plan Calls for Three-Story Building on Long Street Downtown

Brent Warren Brent Warren New Plan Calls for Three-Story Building on Long Street Downtown

The Downtown Commission will hear two proposals for surface parking lots on Long Street this month — an eight-story apartment building at 55 E. Long and a three-story building down the street, at 274 E. Long. The three-story building is proposed for land owned by the Edwards Companies, on a parcel previously targeted by the […]

13 Comments

Pricing Released for Rehabbed Units in Citizens Building at Gay and High

Brent Warren Brent Warren Pricing Released for Rehabbed Units in Citizens Building at Gay and High

Pricing and floor plans have been released for the Edwards Companies’ 63-unit renovation of the Citizens Building on the southwest corner of Gay and High streets Downtown. Amenities listed on the project’s new website include a 24-hour fitness and yoga center, a rooftop patio, and a common area in the building’s restored two-story bank hall. Also touted are […]

5 Comments

Neighborhood Launch Development Reaches Halfway Point

Brent Warren Brent Warren Neighborhood Launch Development Reaches Halfway Point

With 100 owner-occupied units sold and another 100 on the way, the Edwards Companies is celebrating reaching what they are calling the halfway point for the 7.5-acre Neighborhood Launch development. Covering nine city blocks, the development has steadily moved east since its first two buildings — eight units on N. Fourth St. and another 17 […]

5 Comments

More Apartments Proposed for Corner of Long and High Downtown

Brent Warren Brent Warren More Apartments Proposed for Corner of Long and High Downtown

The Edwards Companies is moving forward with plans for 56 additional apartments at the southwest corner of Long and High streets downtown. The new units represent the final piece of a larger development that will fill the entire west side of High Street from Long to Gay Street. The proposed apartment tower will be six […]

32 Comments

Edwards Eyes January Start Date for Gay and High Project

Brent Warren Brent Warren Edwards Eyes January Start Date for Gay and High Project

The Edwards Companies received the green light from the Downtown Commission this week to begin excavation and utility work on their six-story mixed-use project at 85-111 North High Street. Kim Ulle, President at Edwards-affiliate Eclipse Real Estate Group, said that they hope to start work on the site in January, with a goal of final […]

29 Comments

Second Phase of Bishop’s Walk Condos Selling Quickly Downtown

Walker Evans Walker Evans Second Phase of Bishop’s Walk Condos Selling Quickly Downtown

After the Great Recession of 2007-2009, very few for-sale condos have been built in Downtown Columbus or the surrounding urban neighborhoods. Development has certainly bounced back in a big way in recent years, but the overwhelming number of new living spaces are nearly all constructed as for-rent apartment units. That means that the second phase […]

No Comments

The Normandy Wraps Construction, Continues with Leasing

Walker Evans Walker Evans The Normandy Wraps Construction, Continues with Leasing

The Normandy is the first of two new 130-unit five-story apartment buildings located on the Long Street side of Downtown’s Neighborhood Launch development, and the final bits of construction are in the process of being wrapped up. The first tenants began moving into the building on August 1st, and is currently just over one-third occupied. “Leasing […]

No Comments

metro categories

Subscribe below: