New Three-Story Building Proposed for Prescott at Pearl in Italian Village
Home › Forums › General Columbus Discussion › New Three-Story Building Proposed for Prescott at Pearl in Italian Village
- This topic has 59 replies, 21 voices, and was last updated 5 years, 2 months ago by
Nancy H.
-
AuthorPosts
-
August 15, 2013 9:30 pm at 9:30 pm #98392
heresthecaseyParticipantFrom this month’s IVC agenda (page 8),
13-8-15
866 North Pearl Street
Prescott & Pearl, LLC (Applicant) David Pigg (Owner)
An application, photographs, site plan, and renderings have been submitted.
Demolition and New Construction
• Demolish existing brick warehouse building.
• Construct new, five (5) story residential structure with 26 dwelling units.
• First floor to include enclosed garage at grade, with 20 spaces.
Current view of this site, http://goo.gl/maps/5U6j6
August 15, 2013 10:44 pm at 10:44 pm #548470
jbcmh81ParticipantNice. The empty lots are rapidly disappearing. Next up, hopefully, is the eyesore just across the street beside the UDF on High.
August 15, 2013 11:50 pm at 11:50 pm #548472
MercuriusParticipantAny renderings?
August 16, 2013 1:14 am at 1:14 am #548473
heresthecaseyParticipantNone were attached to the agenda, but the project is being presented to the IVC next Tuesday. If anyone goes, I’m pretty curious also as to what this thing will look like.
August 16, 2013 1:41 am at 1:41 am #548475
CalebParticipantColumbus is going V-E-R-T-I-C-A-L (even more).
August 16, 2013 2:34 am at 2:34 am #548476
Walker EvansKeymasterQuite impressive. Between The Hub, The Hub’s Garage and Parkside on Pearl, this stretch is getting very dense, very quickly.
October 16, 2013 2:33 pm at 2:33 pm #548477
heresthecaseyParticipantA little more detail on the project from this month’s agenda,
13-10-12
866 North Pearl Street
Prescott & Pearl, LLC (Applicant/Owner)
An application, photographs, site plan, and renderings have been submitted.New Construction
• Construct a new five-story building with 26 dwelling units.
• First floor to include enclosed parking at grade, with primary access from N. Pearl Street at the west.
• On-site parking to provide 20 spaces, including handicap access and bike storage.
• Building to be constructed to step back from the north and south property lines at first, third, and fourth levels.
• Building materials to include stone veneer, brick veneer and glass.October 16, 2013 3:39 pm at 3:39 pm #548478
goldenideaParticipantAbout a week ago, which was the last time I looked, they’d already removed the original building and had cleared and graded the lot.
October 16, 2013 3:42 pm at 3:42 pm #548480
PabloParticipantgoldenidea said:
About a week ago, which was the last time I looked, they’d already removed the original building and had cleared and graded the lot.Noticed it was fenced off as well.
October 16, 2013 3:43 pm at 3:43 pm #548481
Walker EvansKeymastergoldenidea said:
About a week ago, which was the last time I looked, they’d already removed the original building and had cleared and graded the lot.Oh, it’s already gone? I hadn’t been back there too recently, but I took a photo of that building from on top of the new Hub Garage just a month ago or so… the roof was already half collapsed:
October 16, 2013 4:01 pm at 4:01 pm #548482
druParticipanti am not 100% certain, but based on the IV meeting I attended a couple of months ago, I think the removal of the old building had more to do with the integrity of the old building than it did with permission and preparation to build any new structure.
October 16, 2013 4:32 pm at 4:32 pm #548483
mbeaumontParticipantFrom what I heard at the most recent IV Society meeting, you’re correct, dru.
November 20, 2013 2:47 am at 2:47 am #548485
heresthecaseyParticipantIt looks like this proposal has been scaled down slightly from 26 units over five levels, to 24 over only 3.5. Hopefully, this is able to get approved and moving without much more delay.
15.13-10-12
866 North Pearl Street
Prescott & Pearl, LLC (Applicant/Owner)
An application, photographs, site plan, and renderings have been submitted.New Construction
• Construct a new 3.5-story residential building with 24 dwelling units.
• First floor to include enclosed parking at grade, with primary access from N. Pearl Street at the west.
• On-site parking to provide 20 spaces, including handicap access and bike storage.
• Building to be constructed to step back from the south, east, and west property lines at the top level.
• Building materials to include stone veneer, brick veneer and glass.November 26, 2013 3:54 am at 3:54 am #548486
Walker EvansKeymasterNo real update… but a quick photo of the site with no building…
Photo from here: https://www.columbusunderground.com/construction-roundup-november-2013-part-2
February 15, 2014 8:01 pm at 8:01 pm #548487
mbeaumontParticipantA rendering was passed around at this week’s IVS meeting. Looks pretty nice, imo!
-